Project

PROJECT HISTORY OF PT. LUBUK KAPELANG PERKASA

PT. ATAMORA TEHNIK MAKMUR

SIN Project Name Project Description Contract No. Client Perbd
1 Guide Post Drilling-34 Fabrication Drilling Frame and Post ATM1/39/2014 St3r Energy 2014
2 Wellhead -87” Fabrication ofwellhead BT ATM1/58/2014 St3r Energy 2014
3 Sr;ool Hose Fabrication ofFrame spool Hose ATMl/102/2014 St3r Energy 2014
4 Rig Platform Fabrication Platforms Drilling 400 T ATM/287 /2015 St3r Energy 2015

PT. IEV INDONESA

SIN Project Name Project Description Contract No. Client Perbd
1 Vertical Silo Fabrication Vertical Silo 50 Ton ffK/002/2014 EV 2014
2 Horizontal Silo Fabrication horizaont3I Silo 100 T ffK/045/2014 EV 2014
3 Umbilical Frame Repair Umbilical Frame 300 T ffK/135/2015 EV 2015
4 Vessel 8000 Liters Fabrication of Vessel 8000 Liters ffK/165/2015 EV 2015
5 Cont3iner20 Ft Fabrication open top container ff K/206/2015 EV 2015

PT. TOP SOLUSI MARINA

SIN Project Name Project Description Contract No. Client Perbd
1 Over Head Crane Fabrication ovemead crane 20 T TSM/037/2014 TSM 2014
2 Sppolong Frame Fabrication sppoler Frame50 Ton TSM/067/2014 TSM 2014
3 Turntable Frane Fabrication Turntable Frame TSM/126/2015 TSM 2015
4 Vertical Frame Fabrication of Vertical Frame TSM/0268/2015 TSM 2015

PT. DRDOCK WORLD NANINDA

SIN Project Name Project Description Contract No. Client Perbd
1 T.218 Fabrication and erection Block 0267/09/PI Hallin 2014
2 T.219 Fabrication and erection Block 0269/09/PI Hallin 2014
3 T.228 Fabrication and erection Block 0274/09/PI Hallin 2014
4 T.229 Fabrication and erection Block 0278/09/PI Hallin 2014

ADVANCE OFFSHORE PTE LTD

SIN Project Name Project Description Contract No.                       Client Perbd
1 P.387 Panel Fabrication and Assambly P/376/2015                                   AO 2015
2 P.897 Assambly Block P/786/2015                                 Hallin 2014

PT. PELINDO INDONESIA (PERSERO)

SIN Project Name Project Description Contract No.                       Client Perbd
1 Bima9 Repair BIMA 9 SPK,PL/2014                              Pelindo 2014

PT. VME PROCESS

SIN 1 Project Name Ghana OCTP Development Project Project Description Monorail Load Test Proj!ct No                         Client J-1427                    Yinson Production Perbd 2015/2016
  2   Madura S1rait   Monorail Load Test   J-1429                       Bumi Armada   2016